ОГК-2

ОАО Вторая генерирующая компания оптового рынка электроэнергии

Novocherkasskaya GRES

Novocherkasskaya GRES is located in the Donskoy settlement, Rostov Region.

The plant’s primary fuel is ASH-grade coal from the Rostov coal basin (Almaznaya, Chikh and Sadkinskaya mines, Gukovugol, and Sherlovskaya-Naklonnaya mine), Kuznetsk coal (Kaltansky and Krasnobrodsky strip mines) and natural gas. The reserve fuel is gas; the starting fuel is gas and fuel oil.

Novocherkasskaya GRES is a part of the Southern UPS, and its main competitors are Nevinnomysskaya GRES (JSC Enel OGK-5) and Rostov NPP (JSC Concern Rosenergoatom). Peak regulation is handled by Tsimlyanskaya HPP (JSC Southern Generating Company – TGK-8).

The plant has no seasonal nature of power limitation.

Installed electric capacity is 1,884 MW

Installed heat capacity is 60 Gcal/h

Key figures for 2014

Electricity output, million kWh

10,797

Electricity sales, million kWh

11,254

Heat supply, thousand Gcal

83

CF, %

65

SCEF, gef/kWh

367.9

Headcount

1,156

Fuel mix and fuel consumption in 2014

 

Fuel mix, %

Fuel consumption

Gas

33.31,070 million m3

Coal

66.53,732 thousand tons

Fuel oil

0.05.6 thousand tons
  • Peterburgskoe highway 66,
  • Buid. 1, litera A, St. Peterburg, 196140, Russia
  • (812) 646-13-64
  • mail: office@ogk2.ru
  • Alevtina Tolstykh
  • E-mail: tolai@ogk2.ru
in English пїЅпїЅ-пїЅпїЅпїЅпїЅпїЅпїЅ