Troitskaya GRES

Троицкая ГРЭС

Troitskaya GRES is one of the most powerful basic suppliers of electric power of the South Ural. The plant is convenient-located in the industrial triangle of Yekaterinburg-Chelyabinsk-Magnitogorsk that is characterized by the permanent growth of consumption and high volatility in the conditions of network limits.

The Integrated Power system of Ural which includes Troitskaya GRES is one of the most dynamic concerning electric consumption level increase (about 4% a year). The factor mentioned increases directly demand for electric energy supply generated by the plant.

Troitskaya GRES is a large condensing power plant of general-system importance.

Main equipment includes:

Name

Rated power, MW

Boiler

Turbine

Generator

Type

Quantity

Type

Quantity

Type

Quantity

First stage

225

PK-14-2

6

VT-85-90

3

TV2-100-2

3

Second stage

834

PK-39

3

К-300-240 KhTGZ

3

TGV-300

3

Third stage

970

P-57

2

К-500-240 KhTGZ

2

TGV-500-2

2



Main and back-up fuel is coal that makes the company independent from gas supply limits. Starting fuel is oil-fuel.

Key parameters of the plant:

  • Commission: 1960-1976
  • Installed power – 2059 MW (Share -23,7%)
  • Installed energy power: 2,059 MW
  • Available energy power: 2,059MW
  • Average operating energy power: 1,611 MW
  • Energy consumption for auxiliaries:7.1%

Management

Director:

Parviz Farkhodovich Abdushukurov, tel.:(35163) 3-35-10, e-mail: info@tgres.ru

Chief Engineer:

Igor Borisovich Kayukov, tel.: (35163) 3-49-00, e-mail: paa@sgres1.te.ru

Deputy Director for capital construction:

Mikhail Victorovich Zaitsev, tel. (35163) 3-49-05, e-mail: m_zaytsev@tgres.ru

Chief Accountant:

Galina Gennadievna Ustinkova, tel: (35163) 3-22-10, e-mail: e_ustinkova@tgres.ru

  • 119526, г. Москва
  • Пр-т Вернадского, д. 101, корп. 3, 9-15 этаж
  • Тел.: (495) 428-42-22, 428-42-24
  • Факс: (495) 428-42-23
  • Е-mail: office@ogk2.ru

по-русски