ОГК-2

ОАО Вторая генерирующая компания оптового рынка электроэнергии

Kirishskaya GRES

Kirishskaya GRES is located in Kirishi, Leningrad Region.

The plant uses natural gas as its primary fuel, fuel oil as its reserve fuel, and gas and fuel oil as its starting fuel.

In February 2012,  the CCGT-800 project was brought on line, which involved an upgrade of Power Unit 6 (launched in 1975) and construction of two state-of-the-art gas turbines 279 MW each (made by Siemens) with two brand-new heat recovery boilers over the existing 300 MW steam turbine. As a result of the upgrade, the Power Unit 6 efficiency increased from 38 % to 55 %.

The plant is a part of the North-Western UPS whose generation capacity is also comprised by Leningradskaya NPP (JSC Concern Rosenergoatom), Pskovskaya GRES (JSC “OGK-2”), HPP and CHPP of JSC TGK-1 and North-Western CHPP (JSC “INTER RAO UES”).

The Kirishskaya GRES equipment is geared for quick load increases during the periods of capacity shortfalls in the system and quick load decreases when there is excess capacity, which enables the plant to participate in the system regulation.

Kirishskaya GRES has seasonal nature of power limitation.

Kirishskaya GRES power limitations in 2013, MW

Indicator

Jan

Febr

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Power limitations, total:

44

59.9

61.6

64.3

70.06

79.1

102.1

109.3

76.8

55.5

40

40

CPP

0

0

0

0

0

0

0

0

0

0

0

CHPP

44

45.9

47.5

50.2

56

55.8

56

57.2

55.5

55.5

40

40

CCGT, including

14.06

14.06

14.06

14.06

23.3

46.0

52.1

21.3

0

0

0

seasonal

14.06

14.06

14.06

14.06

23.3

46.0

52.1

21.3

lack of load for type R turbines

44

45.9

47.5

50.2

56

55.8

56

57.2

55.5

55.5

40

40

Kirishskaya GRES has an annual average power limitation of 66.95 MW, of which 50.335 MW is the heat load limitation of type R turbines.

Installed electric capacity is 2,595 MW

Installed heat capacity is 1,234 Gcal/h

Key figures for 2014

Electricity output, million kWh

5,796

Electricity sales, million kWh

6,762

Heat supply, thousand Gcal

3,143

CF, %

25,5

SCEF, gef/kWh

265.3

Headcount

812

Fuel mix and fuel consumption in 2014

 

Fuel mix, %Fuel consumption

Gas

100.01,658 million m3

Coal

Fuel oil

00 thousand tons
  • Peterburgskoe highway 66,
  • Buid. 1, litera A, St. Peterburg, 196140, Russia
  • (812) 646-13-64
  • mail: office@ogk2.ru
  • Alevtina Tolstykh
  • E-mail: tolai@ogk2.ru
in English пїЅпїЅ-пїЅпїЅпїЅпїЅпїЅпїЅ