We present our business opportunities of Krasnoyarskaya GRES-2. If you are looking for a manufacture area with requirements:

Electric power

9ae4982d324a39837d7c8ca75064a5e3.jpg 

  1. The average reserve - 650 MW
  2. At 110 kV the possibility of issuing up to 160 MW per year - 4 billion kWh
  3. At 220 kV the possibility of issuing up to 135 MW per year - 1 billion kWh

The possibility of technological connection of new consumers directly from the branch of "OGK-2" Krasnoyarskaya GRES-2 is the first category of reliability (it’s provided in the construction of the switchgear).

Heat energy

8a6ebf6e19db91a394424fbe74471193.jpg

  1. In a pair of 13 ata: up to 477 Gcal / h
  2. In hot water: the average reserve - 380 Gcal / h
Water

e2e172400acd15c455fd940549f9f5c1.jpg

  1. Chemically desalinated water: up to 600 t / h
  2. Chemically treated water supply for the heating system: to 1170 t / h

Raw materials for building

b7626cb173f44f621f9f22fc45a6a8e3.jpg 

  1. dry fly ash: up to 300 t / d with transport’s shipment

The comfortable geographical position

23f33cf7a36a896cc2364ce36908bf4a.jpg 

  1. Zelenogorsk city is 167 km east from the Krasnoyarsk city
  2. 61 km from the highway M53

Convenient access roads

  1. Roads Class: Ordinary road (not expressway) with seasonal fare restriction of commercial vehicles in the period April-May.
  2. Railway access roads from the station Zaozernaya  to the station Rechnaya for 33 km with the possibility to take part with a maximum of 40 cars and the flows of up to 340 cars a day.
  3. River port of Krasnoyarsk city is located 167 km from Zelenogorsk city.

Equipped areas for freight

ccf831fe6bafb26d7b3fb47c6f63b53e.jpg

Cold store

ecd548f9876d20e75cb4d728152794b3.JPG

Cold store

5f3eef36312c60c43e13e47542d117d7.JPG

Warm store

9a2077a8de6428616f49635bd17646a3.JPG

  1. Coal storage area of 36,000 sq.m.
  2. Features Acceptance of coal 22,000 tons / day
  3. Features drain racks 5 tanks of 65 tons

CategoryUnitsTotal areaFree area
Covered warehousessq.m5698,3on request
Outdoor storage areasq.m126002000

Buildings for production

The station has space for production with all necessary infrastructure (heating, electricity, water, sewer).

93cf2bf1110de0e83f033f9f4f6b413b.JPG 6952fe952a82b7d54d556887cb5da104.JPG
Opportunities
  1. Connection of electricity consumers to distribution devices branch. Ensuring the reliability of power supply for the first category.
  2. Connecting consumers of thermal energy pipeline to connection points.
  3. The ability to enter into direct long-term contracts for the supply of electricity and heat water, condensate directly with the supplier.
  4. The ability to use the existing infrastructure of a large industrial enterprise.
  5. The result  is the minimization of costs for the establishment and operation of new production facilities, the availability of reserves for business development.


Contacts
1. Advisor to the General Director of JSC "OGK-2"

Yakovlev Anatoly Viktorovich
Tel: (495) 428-53-51

2. Krasnoyarskaya GRES-2
  
Address: 663690, Russian Federation, Krasnoyarsk, Zelenogorsk, st. First Industrial 2
Branch Director:
Lyspak Alexander Tel. (391-69) 3-30-49

Experience of JSC "OGK-2" with industrial customers in the retail and wholesale electricity markets may become the basis for an effective business with potential for further growth.
  • Peterburgskoe highway 66,
  • Buid. 1, litera A, St. Peterburg, 196140, Russia
  • (812) 646-13-64
  • mail: office@ogk2.ru
  • Alevtina Tolstykh
  • E-mail: tolai@ogk2.ru
in English пїЅпїЅ-пїЅпїЅпїЅпїЅпїЅпїЅ